Cabins Installation and Construction Information
Basic Cabin Installation Includes
• On Site Delivery and Construction of all Materials
• Leveling of Building up to 12" Using Concrete Blocks
• Pressure Treated 4"x 6" Runners set on Concrete
Blocks
• Pressure Treated 2"x 6" Floor Joists, 16"
on Center
• ¾" Flooring
• Pressure Treated Front Porch & Deck
(8' Wide x Length of Building)
• 2" x 4" Wall Studs, 16" on Center
• Permanent 3' Stairway to Second Floor
• (1) 3/0 x 6/8 Six-Panel Steel Door with Deadbolt & Door
Knob
• 30-Year Wood Siding (Primed and Treated)
• Double Top Plate
• 2"x 6" Rafters, 24" on Center
• ½" A.P.A. Certified Plywood Roof Decking with
30lb. Roof Felt
• #1 Grade 20-Year Fiberglass Roofing Shingles
• Full 6 Year Warranty on Workmanship & Material
For any additional information regarding installation and/or processing questions, please contact us: (832) 916-0587
Featured Cabin Special
